March 23, 2009

Civil Works Implementation Manager (Togo)

Job ref No Competency Level Start Date Duration Location
ZN-654C Expert 1 April 2009 16 months Lome, Togo

If you are interested in this position kindly quote the job reference number, indicate your availability, monthly rate and the confirmation letter.


SAMPLE CONFIRMATION LETTER:
I (NAME & SURNAME), authorize Znix Consulting to represent me for the (NAME OF POSITION)
position located in (NAME OF COUNTRY).

The following will be provided:
Accommodation, Local transportation,
Business related expenses,
1 round trip flight (Original location to place of work),
SIM for business use, Consultant to provide own Laptop.  

Job Description:

Tasks:

- Civil Works, logistics, project management & planning, (for implementation managers)
- Admin, budgets

Requirements:

- Tower climbing certificate (if candidate doesnt have, they must be very competent and willing to undergo
  training to obtain certification at own cost)
- French, English; local personnel preferable
- GPS, Safety Equipment (e.g. harness, fall arrestor, etc.)
- Excellent client/co-worker interaction skills

P.S

  Ensure that your I.D photo is attached to your CV; also include 3 references.

  The deadline for the submission of CVs is Monday 23rd March 2009.

http://www.znix.co.za/index.php?option=com_content&view=article&id=66&Itemid=2

http://civilengineeringjobintelecom.blogspot.com/

2 comments:

  1. Curriculum vitae

    Mohammed Mahmood
    India,mobil No.00919959237487
    Sudan,mobil No.00249925588349
    mahmoodone@gmail.com
    urmajid8112@yahoomail.co.in


    Objective:

    To have a challenging career in telecom field in which my skilled are enhanced for the betterment of the organization.

    Skills Summary
    Having more then 6 years of experience in the field of Mobile Telecommunication in installation and Commissioning of GSM 2G&3G Base Transceiver Stations:Nokia Ultra site BTS,Nokia Flexi 2g & 3g BTS, Metro Site BTS, Ericsson RBS 2202, RBS 2206,and Installation and Commissioning of Microwave Systems, & Alignment, Nokia Flexi hopper, Ericsson MiniLink &Civil Works.


    Present Working

    Company : Iajazi Investment Company

    Project : Nokia Siemens networks, MTN.

    Location : Khartoum, Sudan.

    Position : Site Team leadar

    Period : Nov 2007 to till date.

    Nokia Equipment for ZAIN SUDAN

    Nokia Siemens networks, ERICSSON, Trouble shooting. 3G Nokia Flexi Cabinet, 3G Ericsson 3206.

    • Voltage standing VSWR wave ratio measurements.
    • Installation &Commissioning of power plant battery bank, SMPS and rectifier modules..
    • Type of Project: Rollout 2G/3G System:
    • RBS 2206, 2206V2
    • Responsibilities for Siemens BTS & Mini Link
    • Commissioning Mini Link
    • Responsibilities for ERICSSON RBS & Mini Link
    • Commissioning of Mini Link ERICSSON PDH, SDH& TN
    • Site inspections relevant to the Ericsson International Quality Standard.
    • Conducting Training and Seminars in the Training room and also actual work in the job site specifically.
    • Preparing Quality Guidelines regarding the Telecommunication Process and Relia.
    • Conducting non – stop follow ups for all pending, halted and slow moving sites with Major, Critical Problems Telecommunication sites.
    • All the above cited and mentioned responsibilities were done in the present actual job
    • responsibilities both in the Capital City of Khartoum and into the entire Country of Sudan.
    Expert in Nokia:

    Cross connection, E1 patching. Trouble shooting.
    • Nokia BTS Manager 2G, 3G WCDMA BTS Manager Nokia Flexi Hopper.
    • Acceptances with Costumer.

    Responsibilities:

    • Ericsson Equipment
    • Installation & Commissioning of High Capacity & Medium Capacity Mini Link of Ericsson (13GHz, 15GHz, 23GHz, 38GHz) with Configuration 1+0,1+1 outdoor and indoor units.
    • Installation and of traffic note of 6p with cross connections
    • Performed alignment of Microwave antenna’s to achieve the actual design received level as it was planned.
    • Responsible for assigning appropriate workloads to subordinates.
    • Supervened perform Installation of 3G RBS 3206, Antenna's & Feeder.
    • Performed and assist in CUT-OVER/DOWNTIME (MDT) procedures where in
    • RF cable testing and trouble-shooting using (SITE MASTER)
    • Performed swept test using (SITE MASTER) and troubleshooting if problem encountered.
    Project “Worked in:

    • GSM antennas installation RF cable Laying
    • RBS Installation types 2202,2206
    • Battery Bank installation
    • SMPS installation
    • Customer Acceptance test Alarm Testing, BTS

    Work Experience in Civil:


    Installation of shelter
    Installation of Air condition (A/C)
    Installation of cable tray
    Installation of power connection
    Installation of cables earth rod
    Installation of lightning rod
    Installation of Elevation Light
    Installation of Alram System
    Installation of A/C controller
    Installation of Main Distribution
    Installation of door Sensor
    Installation of Smoke Sensor
    Installation of Water sensor
    Installation of Photo Sensor
    Installation of Tube Light
    Installation of Out door lamp
    Installation of Switches&Socket


    HAYAT Shelter ,ALCON Shelter , CISCOM Shelter ,HO Shelter
    and All types of Shelter
    All type of Electricals works & all type Alams Internal works
    connection & testing




    IN INDIA TELECOM EXPERIENCE


    ICOMM

    Tele Limited Corporate Office:
    Trendset Towers,Road No,2, Banjara Hill,
    Hyderabad – 500034
    Tel :4023552222
    Fax : +91-4o-23552266



    RENAISSANCE TECHNICAL SERVICES ANDHRA PRADESH

    This company engaged in installation, maintenance and supervision of various types of Telecom switches, GSM and CDMA cell sites and other telecom ventures. Presently working for IDEA Cellular ltd (AP), Hutch (AP & Karnataka), Tata Indicom ltd (AP) and lucent technologies India.

    Period:- from September –2002 to Jul2005
    Designation: - Implementation Engineer

    Project’s worked in:

    Nokia Equipment for IDEA Cellular Ltd, A.P, INDIA.

    • Installation & Commissioning of Nokia BTS (intra talk, indoor ultra, outdoor Ultra and Metro) internal connections, DC power cable & RF cable termination, Grounding and Grouting.
    • VSWR Voltage standing wave ratio measurements.
    • Installation of power plant battery bank, SMPS and rectifier modules.
    • Installation& Commissioning alignment of Flexi 0.3 to 1.8mtrs MW Hops.
    • Installation of modems.
    • Alarm cable kroning and Integrate.

    Network modifications for IDEA Cellular Ltd

    • Swapping of BTS with intra talk to ultra visa or versa
    • Installation of GSM Repeaters 10dbm to 14w indoor or outdoor.
    • Sector additions
    • Installation of Expansion cabinet.
    • Up-gradation of metro to ultra site.

    TOOLS HANDALED

    • V.S.W.R ( Anritsu S331D )
    • V.S.W.R ( Bird )
    • Frequency counter
    • Power meter

    Education Qualification : SSC

    Technical Qualification : I.T.I in Electronics.

    Computer Knowledge : Windows 98, 200.Xp MS Word, MS
    Excel, Power point.


    Personal Details:-

    Father’s name : Mr.Mohammed Mahboob
    Date of Birth : 24/07/1978
    Marital Status : Married
    Nationality : Indian
    Language Know : English, Arabic, Hindi, and Urdu

    Passport Details:-

    Passport No : G2860281
    Date of issue : 24/04/2007
    Date Expiry : 19/04/2017
    Place of issue : Hyderabad


    MOHAMMED MAHMOOD

    ReplyDelete
  2. Hi,I have fifteen years relavant experience. I am available to start immediately and can be contacted on +84904866141.
    MARIUS NICO MIENY

    ReplyDelete